ZAO造

Meter

How close a measure is to its limit.

Preview

Su uses the Quiet instrument direction. Hover, tap, or tab into the chart to inspect it.

budget.spendOct 1–31 · budget $6,000
x

Arrow keys move between data. Enter selects. Escape clears.

Cloud spend, OctoberIllustrative data$3,720 spent, 62% of the $6,000 budget. At the month-to-date rate, spend reaches $5,766 by Oct 31 and crosses the $5,400 alert on Oct 30.
62% used · $2,280 leftUSD

Illustrative readings arrive about once a second.

Local simulation of readings loading.

States

Zero, a fractional reading, full, over the limit, unknown, and no limit.

  • Zero

    budget.spendOct 1–31 · budget $6,000
    x

    Arrow keys move between data. Enter selects. Escape clears.

    Cloud spend, zeroIllustrative data$0 spent, 0% of the $6,000 budget.
    0% used · $6,000 leftUSD
  • Fractional

    budget.spendOct 1–31 · budget $6,000
    x

    Arrow keys move between data. Enter selects. Escape clears.

    Cloud spend, fractionalIllustrative data$1,234.56 spent, 21% of the $6,000 budget.
    21% used · $4,765.44 leftUSD
  • Full

    budget.spendOct 1–31 · budget $6,000
    x

    Arrow keys move between data. Enter selects. Escape clears.

    Cloud spend, fullIllustrative data$6,000 spent, 100% of the $6,000 budget. That is past the $5,400 alert.
    100% used · $0 leftUSD
  • Over

    budget.spendOct 1–31 · budget $6,000
    x

    Arrow keys move between data. Enter selects. Escape clears.

    Cloud spend, overIllustrative data$6,310 spent, $310 over the $6,000 budget.
    Over by $310USD
  • Unknown

    budget.spendOct 1–31 · budget $6,000
    Cloud spend, unknownIllustrative data
    USD
    Loading cloud spend
  • No budget

    budget.spendOct 1–31
    Cloud spend, no budgetIllustrative dataNo budget is set, so spend has nothing to be measured against.
    No budget setUSD

When to use

  • Use a meter for one measure against a known limit, such as a budget, quota, or capacity. For task completion, use Progress. For one share of a total with no limit, use the ring.
  • The meter reuses Progress’s recessed well and ink face, and steps between readings without a transition.
  • Mark an alert or target as a dashed tick across the well, labeled with its value.
  • Draw a projection only from a stated method, as an outline from the reading to the projected value, never filled. The summary names it.
  • Above the limit, the face fills the well and a filled square sits past the end stop. The overage is written in the readout and summary, not drawn to scale.
  • Without a known limit there is nothing to measure against: the meter shows its empty well and says so.
  • Follow the data visualization guideline for the five rules every chart shares.

Anatomy

Well
Progress’s recessed track, from zero to the limit.
Face
The reading in ink, with Progress’s contact edge.
Reference
The dashed alert, labeled with its value.
Projection
A hairline fg-muted outline from the reading to the projected value.
Ruler
Graduations at each quarter of the limit, with zero and the limit labeled.
Accent
The current reading on the ruler, in ink.
Top row
The series budget.spend on the left and the period and limit on the right, in mono.
Summary
A title and one sentence in sans that carry the essential reading without inspection.
Bottom row
The readout (region, amount, share) and the unit (USD).

Accessibility

The well is a meter with a name and a value text. Used, Left, and Over are native buttons in one tab stop; focus or hover inspects, Enter, Space, or a tap selects, and Escape clears. The summary carries the reading, the projection and its method, and any overage, and Show data lists every value.